![]() |
||||
![]() |
![]() |
![]() |
![]() |
![]() |
Title: | Last Post By: | Posts: |
---|---|---|
Introducing the CLC Ultralight Dinghy | mbiq » Sat, 8/29/15 » 3:40 PM | 0 |
1. Laminating the Skeg | shepshepard » Sat, 12/5/20 » 5:47 PM | 0 |
2. Gluing the Doublers | CLC Forum Admin » Thu, 8/27/15 » 1:55 PM | 0 |
3. Cleaning up Epoxy Squeeze-out | CLC Forum Admin » Thu, 8/27/15 » 1:58 PM | 0 |
4. Pre-coating Transoms, Frame, and Stringer | shepshepard » Sun, 12/6/20 » 3:20 PM | 0 |
5. Rounding Over the Transoms | CLC Forum Admin » Thu, 8/27/15 » 2:07 PM | 0 |
6. Finished Transom Handles | CLC Forum Admin » Fri, 8/28/15 » 10:25 AM | 0 |
7. Hull Parts Ready for Assembly | DICKDOWDELL » Fri, 12/28/18 » 2:23 PM | 0 |
8. Wiring #1 Panels | CLC Forum Admin » Fri, 8/28/15 » 10:28 AM | 0 |
9. #1 Panels Stitched in Place | CLC Forum Admin » Fri, 8/28/15 » 10:31 AM | 0 |
10. Adding the Center Frame | CLC Forum Admin » Fri, 8/28/15 » 10:35 AM | 0 |
11. Aligning Mortises and Tenons | CLC Forum Admin » Fri, 8/28/15 » 10:38 AM | 0 |
12. Adding the Longitudinal Stringer | CLC Forum Admin » Fri, 8/28/15 » 10:39 AM | 0 |
13-14. Stitching Stringer to Bottom Panel | CLC Forum Admin » Fri, 8/28/15 » 10:44 AM | 0 |
15. Adding Bow & Stern Transoms | CLC Forum Admin » Fri, 8/28/15 » 10:46 AM | 0 |
16-17. Dropping Stern Transom into Place | CLC Forum Admin » Fri, 8/28/15 » 10:48 AM | 0 |
18. Ready for the Side Planks | CLC Forum Admin » Fri, 8/28/15 » 10:50 AM | 0 |
19. Adding the #2 Panels | CLC Forum Admin » Fri, 8/28/15 » 10:51 AM | 0 |
20. Adding the #3 Panels | CLC Forum Admin » Fri, 8/28/15 » 10:52 AM | 0 |
21. Bow Stitching Detail | CLC Forum Admin » Fri, 8/28/15 » 10:54 AM | 0 |
[1-20] [21-40] [41-60] [61-80] [81-100] [101-104] next >>