Please login or register to post to this forum.



  
Title: Last Post By: Posts:
10. Adding the Center Frame CLC Forum Admin » Fri, 8/28/15 » 10:35 AM 0
11. Aligning Mortises and Tenons CLC Forum Admin » Fri, 8/28/15 » 10:38 AM 0
12. Adding the Longitudinal Stringer CLC Forum Admin » Fri, 8/28/15 » 10:39 AM 0
13-14. Stitching Stringer to Bottom Panel CLC Forum Admin » Fri, 8/28/15 » 10:44 AM 0
15. Adding Bow & Stern Transoms CLC Forum Admin » Fri, 8/28/15 » 10:46 AM 0
16-17. Dropping Stern Transom into Place CLC Forum Admin » Fri, 8/28/15 » 10:48 AM 0
18. Ready for the Side Planks CLC Forum Admin » Fri, 8/28/15 » 10:50 AM 0
19. Adding the #2 Panels CLC Forum Admin » Fri, 8/28/15 » 10:51 AM 0
20. Adding the #3 Panels CLC Forum Admin » Fri, 8/28/15 » 10:52 AM 0
21. Bow Stitching Detail CLC Forum Admin » Fri, 8/28/15 » 10:54 AM 0
22. Tightening the Wires CLC Forum Admin » Fri, 8/28/15 » 10:55 AM 0
23. Ready for LapStitch Joint Panels (4, 5, 6) CLC Forum Admin » Fri, 8/28/15 » 10:57 AM 0
24-27. Stitching on Panels 4, 5, 6 CLC Forum Admin » Fri, 8/28/15 » 11:02 AM 0
28-29. Adding Stitch Holes CLC Forum Admin » Fri, 8/28/15 » 11:04 AM 0
30. Completed Assembly CLC Forum Admin » Fri, 8/28/15 » 11:07 AM 0
31. Tack-Welding the Hull CLC Forum Admin » Fri, 8/28/15 » 11:08 AM 0
32-33. Transom Tack-Welds CLC Forum Admin » Fri, 8/28/15 » 11:10 AM 0
34-35. Tack-Welding the Hull Seams with CA Glue CLC Forum Admin » Fri, 8/28/15 » 11:12 AM 0
36-37. Removing the Wires CLC Forum Admin » Fri, 8/28/15 » 11:14 AM 0
38-39. Epoxy Fillets CLC Forum Admin » Fri, 8/28/15 » 11:16 AM 0

    [1-20]  [21-40]  [41-60]  [61-80]  [81-100]  [101-104]   next >>