Please login or register to post to this forum.



  
Title: Last Post By: Posts:
Introducing the CLC Ultralight Dinghy mbiq » Sat, 8/29/15 » 3:40 PM 0
1. Laminating the Skeg shepshepard » Sat, 12/5/20 » 5:47 PM 0
2. Gluing the Doublers CLC Forum Admin » Thu, 8/27/15 » 1:55 PM 0
3. Cleaning up Epoxy Squeeze-out CLC Forum Admin » Thu, 8/27/15 » 1:58 PM 0
4. Pre-coating Transoms, Frame, and Stringer shepshepard » Sun, 12/6/20 » 3:20 PM 0
5. Rounding Over the Transoms CLC Forum Admin » Thu, 8/27/15 » 2:07 PM 0
6. Finished Transom Handles CLC Forum Admin » Fri, 8/28/15 » 10:25 AM 0
7. Hull Parts Ready for Assembly Dick Dowdell » Fri, 12/28/18 » 2:23 PM 0
8. Wiring #1 Panels CLC Forum Admin » Fri, 8/28/15 » 10:28 AM 0
9. #1 Panels Stitched in Place CLC Forum Admin » Fri, 8/28/15 » 10:31 AM 0
10. Adding the Center Frame CLC Forum Admin » Fri, 8/28/15 » 10:35 AM 0
11. Aligning Mortises and Tenons CLC Forum Admin » Fri, 8/28/15 » 10:38 AM 0
12. Adding the Longitudinal Stringer CLC Forum Admin » Fri, 8/28/15 » 10:39 AM 0
13-14. Stitching Stringer to Bottom Panel CLC Forum Admin » Fri, 8/28/15 » 10:44 AM 0
15. Adding Bow & Stern Transoms CLC Forum Admin » Fri, 8/28/15 » 10:46 AM 0
16-17. Dropping Stern Transom into Place CLC Forum Admin » Fri, 8/28/15 » 10:48 AM 0
18. Ready for the Side Planks CLC Forum Admin » Fri, 8/28/15 » 10:50 AM 0
19. Adding the #2 Panels CLC Forum Admin » Fri, 8/28/15 » 10:51 AM 0
20. Adding the #3 Panels CLC Forum Admin » Fri, 8/28/15 » 10:52 AM 0
21. Bow Stitching Detail CLC Forum Admin » Fri, 8/28/15 » 10:54 AM 0

    [1-20]  [21-40]  [41-60]  [61-80]  [81-100]  [101-104]   next >>