An Epoxy question...

Posted by PeteWP on Jun 25, 2006

Im running low again on epoxy. I waste an awful lot.

Im coming to the AKA construction and Im wondering exactly how much epoxy I will need to cover the area between the strips. Two cups - Three? That is with thickener and all. Does anyone have an idea how much I will need so I dont run short in the process?

Pete

Replies:

No Replies.