Re: Flying Pigs

Posted by Chris on May 27, 2004

Just an added thought while you're at that stage, someone a while back mentioned putting a small V notch right dead center of the deck beam where it joins the deck so that when you flip it over to dry out, any residual water can drain out versus pooling behind the deck beam. I drilled a hole after the fact but it's a good idea. Lots easier to get that last inch of water out.

In Response to: CH 17 Fore deck beam by Pat on May 24, 2004

Replies:

No Replies.