Eastport nesting pram, panel #1, rabbet or no rabbet?

Hi,

I'm building the eastport nesting pram from stratch.

I've transfered everything to plywood and cut out all the peices, I'm about to put in th rabbets. However the instruction book says that "The bottom panel and #1 panel are not rabbeted", however the plans say to put a rabbet in there, and the pictures of the construction process have one in as well.

It seams like I should put them in. Am I right?

I have version 2.1 5/2011 of the instruction manual if it helps

 

Cheers,

James


3 replies:

« Previous Post       List of Posts       Next Post »

RE: Eastport nesting pram, panel #1, rabbet or no rabbet?

 

   I built this from plans version 2.3 1/2014. Page 17 ...rabbit along the lower edge or panels 2,3,4. 

This is what I did and it makes sense as you look at the plans.

Jeff

RE: Eastport nesting pram, panel #1, rabbet or no rabbet?

James,

i went to look at my boat and I did rabbit the number 1 plank. Also I had a note to myself in my plans booklet confused about this and referred to the full size plan sheet    to resolve the issue.

Rabbit plank #1.

Jeff

RE: Eastport nesting pram, panel #1, rabbet or no rabbet?

James,

Build pictures of my East Port Nesting Pram you my be interested to view:

  http://sailboatbuild.blogspot.com/2016/06/two-things-east-port-nesting-pram-from_46.html

Jeff