Re: modified sailrig deck
Posted by LeeG on Jul 25, 2005
yer ahead of me,,I don't know exactly what the sequence of construction is,,I assume it's like the kayaks with sheerclamps pre-glued to side panels and the whole thing wired together over bulkheads then the deck glued on that in pieces around the bulkheads. If there's too much rocker to the sheer it's not possible to have one piece deck sections bend in two planes too far without it folding but I guess if the deck on the amas is in three sections then the only challenge is getting the ends to curve. Maybe you could do the ends first with temporary stick holding the camber then pulling it through the holes in the bulkheads?
In Response to: Re: modified sailrig deck by don on Jul 25, 2005
Replies:
- Re: modified sailrig deck by don on Jul 26, 2005
-
Re: modified sailrig deck by CLC on Jul 26, 2005
- Re: modified sailrig deck by Brently Gill on Jul 26, 2005
- Re: modified sailrig deck by don on Jul 27, 2005
- Re: modified sailrig deck by don on Jul 27, 2005
- Re: modified sailrig deck by Brently Gill on Jul 26, 2005
-
Re: modified sailrig deck by CLC on Jul 26, 2005