Builders' Forum Archives |
Build Time
Posted by Shuswap Pat on Mar 7, 2005
I am building a couple of Ches 17 with a group, and wondering if anyone has kept a log on time spent building from plans? Just trying to get a feel for how long it will take, as we move through the stages. ie - Cutting Plywood, laying out, scarfing, making shear clamps, deck beams, wiring hull etc.
Thanks
Pat
Replies:
- Re: Build Time by terry on Mar 7, 2005
- Re: Build Time by Tony Calvert on Mar 7, 2005
- Build Time by Doug Judd on Mar 7, 2005
-
CH16 Build Time by Doug Judd on Mar 7, 2005
- Re: CH16 Build Time by terry on Mar 8, 2005
-
CH16 Build Time by Doug Judd on Mar 7, 2005
- Re: Build Time by Laszlo on Mar 7, 2005
- Re: Build Time by Gavin H on Mar 7, 2005
- Re: Build Time by Steve Miller on Mar 8, 2005
- fast epoxy by LeeG on Mar 8, 2005
-
Re: fast epoxy by CLC on Mar 9, 2005
- Re: fast epoxy by terry on Mar 10, 2005
- Re: fast epoxy by LeeG on Mar 10, 2005
- Re: fast epoxy by LeeG on Mar 10, 2005
- Re: fast epoxy by LeeG on Mar 10, 2005
- Re: fast epoxy by terry on Mar 10, 2005
-
Re: fast epoxy by CLC on Mar 9, 2005